Technology Village
Duluth, MN
This innovative building in the heart of downtown Duluth is designed to offer high-tech businesses the absolute best in information technology. Along with several high-tech businesses including one of the country's premier IT training schools, the Technology Village is home to several financial, retail and service professionals, including a unique Italian restaurant.
Tenants have access to a Fiber Network and a 100 Base T Network with extremely wide band width including:
- Up to T5 access with self repairing redundant connections and redundant power
- 144 multi-mode fiber from main communications room to each floor
- Category 3 and 5E data and voice wiring between floors
- Local access, OC12 Sonet fiber ring protected (620 mbps)
Square Feet: 220,000
Project Duration: 12 months
VGD Properties / La Maison VanGogh
Wayzata, MN
This property in downtown Wayzata was redeveloped from a single story structure with commercial use into a three story multi-use building including first floor retail and a second & third story condominium with an elevator and large roof top garden area with views of Lake Minnetonka.
SourceGroup worked with the owner and architect to resolve numerous site issues including; contaminated soils and special structural issues to make the project financially feasible for the owner.
Square Feet: 4,500
Project Duration: 5 months
St. Luke's Medical Office Pavilion & Parking Ramp
This medical office building and Ambulatory Surgery Center has 4 OR's and provides clinical space for many specialty physicians ranging from dermatologists to neurosurgeons.
The facility also has an attached 2-story, 95-stall parking ramp and a detached multi-story 232-stall parking ramp.
Square Feet: 46,000
Project Duration: 12 months
United Health Care
This claims processing center in Chico, CA contains supervisory offices, training centers, individual work stations and loading areas.
The design also includes state-of-the-art high speed communication systems, redundant power, employee sensitive HVAC/electrical amenities, and full service cafeteria/dining services.
Square Feet: 102,000
Project Duration: 12 months
|